30.08.2008

Passenger sea terminal on Vasilyevsky island

Port of Saint-Petersburg

09.09.2006 - 08.08.2008

Construction period

LLC «UK» Marine facade of St. Petersburg

Client

Description

The terminal is designed to accommodate cruise and liner passenger ships up to 300 m in length.

The terminal includes:

  • Approach channel.
  • Terminal offshore area (turning area and operational waters of quays).
  • Quayside containing 7 quays.
  • Territory development.
  • Bank stabilization.
  • Navigation equipment facilities.
  • Complex of onshore buildings and structures for servicing passenger and vehicle flow including the Russian border inspection post.

The scope of work

  • Installation of face and anchor walls of quays No. 2, 3, 4, 5 with total length of 944 m.
  • Mounting of wales and installation of anchor rods.
  • Installation of metal pile shells with diameters of 820 and 1,020 mm.
  • Concreting of the superstructure (unloading platform).

Features of the object

  • Severe weather conditions

    Work on high-precision pile driving was carried out during storms.

  • Difficult logistic conditions

    Delivery of concrete mortar and its timely installation was carried out in the open sea.

  • Open sea

    Installation of navigation equipment was carried out at a distance from the coastline of the Gulf of Finland.

Passenger sea terminal on Vasilyevsky island

Port of Saint-Petersburg

Passenger sea terminal on Vasilyevsky island

Port of Saint-Petersburg