tel.: +7 (812) 334-43-19fax: +7 (812) 334-43-11

Reconstruction of Berthing Dolphin of Upper Approach of Don Shipping Lock

Заказчик строительства: «АД ГБУВПиС НДРГС»
Генеральный подрядчик: ЗАО «ГТ МорРечСтрой»
Подрядчик (субподрядчик): ЗАО «ГТ Морстрой»
Период строительства: 2002 г
Address: Россия, Ростовская обл., Кочетовский гидроузел

In 2002, GT Morstroy completed the reconstruction of the berthing dolphin of the upper approach of the Kochetovsky hydroelectric complex shipping lock on the Don River.

The berthing dolphin has length of 242 m and average width of 6.5 m. The depth at the apron is 5.5 m.

The berthing dolphin is a two-row inter-barrier wall made of metal sheet pile.

The coating is made of monolithic reinforced concrete.

The berthing dolphin is equipped with 20 tf mooring bollards and a metal guard railing.

Reconstruction of the dolphin ensured the passage of up to 5 thousand tons ships and increased the safety of navigation through the lock.