Marine Passenger Terminal on Vasilievsky Island (Saint-Petersburg)

Заказчик строительства: В ЗАО «Терра-Нова»
Генеральный подрядчик: ЗАО «ИК «Трансстрой»
Подрядчик (субподрядчик): ЗАО «ГТ Морстрой»
Период строительства: 08.2008-12.2008 г.
Address: Россия, Санкт-Петербург

According to the project, the construction of single-stage car ramps with a turning circle is envisaged for quays Nos. 2, 3 of the Marine Passenger Terminal on Vasilievsky Island.

The plan dimensions of the ramps are 35x70 meters.

In the period from August to November 2008, GT Morstroy completed installation of the pile foundation for automobile single-stage lifting and transition ramps. The pile foundation is a high pile grillage on metal piles-shells (with pile diameter of 1420 mm, wall thickness of 16 mm, length ranging from 49.0 to 50.0 m).

Totally, 114 piles of 5588 m total length were driven.

In the period from August to December 2008, GT Morstroy performed construction and erection of a pile foundation for supports of pedestrian gallery of quay No. 3 of the Marine Passenger Terminal on Vasilievsky Island. The pile foundation is made from metal piles-shells of 820 mm diameter with 10 mm thick walls and length from 30.77 to 44.75 m.

The total length of 70 driven piles was 2393 m.