tel.: +7 (812) 334-43-19fax: +7 (812) 334-43-11

Full Repair of Berth in the Sea Port Yeisk

Заказчик строительства: Морская администрация Ейского морского пароходства
Генеральный подрядчик: ЗАО «ГТ МорРечСтрой»
Подрядчик (субподрядчик): ЗАО «ГТ Морстрой»
Период строительства: 2002 г
Address: Россия, Краснодарский край

In 2002, «GT Morstroy» performed full repair of the quay of the Sea Port designed for passenger vessels.

The quay length is 242 m and width is 10 m. The depth at the apron is 4.5 m.

The quay is an anchored bulkhead from steel sheet pile.

The rear pile rows of metal pipes are used as anchor components.

The quay is equipped with fenders made from motor car tires and mooring bollards designed for 10 tf.

The metal pipe railing is made along the jetty head.

The full repair works include the quay area coverage with prefabricated reinforced concrete plates and fence.