Full Repair of Landside Slopes in the Sea Port Yeisk

Заказчик строительства: МАП «Ейский морской порт»,ОАО «Ейский Морской торговый порт»
Генеральный подрядчик: ЗАО «ГТ МорРечСтрой»
Подрядчик (субподрядчик): ЗАО «ГТ Морстрой»
Период строительства: 1999-2000 г
Address: Россия, Краснодарский край

In 1999-2000, «GT Morstroy» performed full repair of the Western and Eastern landside slopes designed for loading operations.

The works were performed in two stages:

  • The first stage included full repair of the Western landside slope. The construction was started in May and finished in September, 1999. The quayside length was 74 run. m.
  • The second stage included full repair of the Eastern landside slope. The construction was started in January and finished in September, 2000. The quayside length was 189 run. m.

The quays are anchored bulkhead from steel sheet pile.

For anchoring, the reinforced concrete anchor plates were used.

The quays were equipped with mooring bollards and fenders made from motor car tires.

The works included the territory construction and mounting of covering from prefabricated reinforced concrete plates.